Saturday, June 22, 2013

Day 7




Rain has plagued our progress throughout, but gave way to sun for a productive day.  We experimented with sheathing the wall on the floor by just nailing the plywood to the top of the wall, raising it, and nailing it when level with the floor.  The other method was using a carpenter's square to ensure 90 degree angles at each wall corner, and nailing the plywood fully while still on the floor.  This was the preferred technique.  Getting up on the ladder to nail the walls was a mighty pain in the derriere.

No comments:

Post a Comment